Any imput on this would be greatly appreciated!!!!
I have a 16" with the pier and a steel plate for mounting. I also have a deck that used to go partially on one side of a 21' oval pool. The pool has been removed and I am going to place an observatory in it's place. The deck sits 4 feet from the ground, and I will need to elevate the height of the pier to around 10 to 15' high to help clear my house roof on one side. Since this will be in an 10' observatory, I am thinking of pouring a large pad, and having the steel beams bolted and then tied together to form the base structure to place the pier assembly on.
Any opinions would greatly be appreciated..
I have a 16" with the pier and a steel plate for mounting. I also have a deck that used to go partially on one side of a 21' oval pool. The pool has been removed and I am going to place an observatory in it's place. The deck sits 4 feet from the ground, and I will need to elevate the height of the pier to around 10 to 15' high to help clear my house roof on one side. Since this will be in an 10' observatory, I am thinking of pouring a large pad, and having the steel beams bolted and then tied together to form the base structure to place the pier assembly on.
Any opinions would greatly be appreciated..