It is time to rebuild my dob base (12" steel tube 14"OD) and I am seeking Ideas to incorporate the following: Thousand Oaks Controller, battery pack, wiring (neatly), Dip meter (alt angle indicator). Also, there have been posts on stabilizing the mount, plus recommendations for teflon/ebony star surfaces, etc. Of interest would be items like installing tracking components, location of bubble level, a lock to temporarily freeze the az rotation, increasing the size of the trunions, and other recommendations. See attached photo for above mentioned equipment. All suggestions will be welcome.
Attached Image:
I Yam What I Yam!