Image of the day

Captured by
Michael Scherman

M17 Swan-Omega Celestron C6 Hyperstar2

My Account

New to Astromart?

Register an account...

Need Help?

Curing concrete, how long to wait?

Started by IGastaldo, 09/11/2005 11:30PM
Posted 09/11/2005 11:30PM | Edited 09/11/2005 11:31PM Opening Post
Trying to get a feeling for how long to wait before I peel off the 12" diameter cardboard sonotube from the concrete pier I just poured 24 hours ago?

Would you say 48 hours is safe, or better 72? or more?

Thanks for the input, Concrete DIY Gurus! wink

Ivan Gastaldo 8)
Coconut Creek, FL

Ivan's Observatory
Lat 26N 16' 48" Long 80W 10' 48"
[COLOR="Red"]Personal Website:[/COLOR] http://www.ivangastaldo.com

CCD Imaging and Processing/Deep Sky - Moderator
I like to complain about everything - Moderator
Posted 09/12/2005 01:07AM | Edited 09/12/2005 01:09AM #1
Ivan,
Concrete is very similar in nature to the dental stones we use in the lab (calcium sulfate dihydrate). As the stone sets it creates heat and forms a crystal structure.....exothermic reaction. You can usually feel the heat from the stone when it sets. Once you feel the stone start to cool down it has set enough to remove it from its form.
There are actually a few ways to accelerate the stone crystallization process:

1. Use warm water when you mix the powder.

2. Use a Saturated CaSo4 solution or SDS. To make this solution mix some of the stone or concrete with water and let the powder settle out to the bottom of the bucket. The SDS will be dissolved in the water. Use this water to mix with the concrete. The stone will usually set in half or less time.


But then again....you were probably so hot from mixing 18 bags of concrete you wouldn't have felt the temprature diffrence in the stone!!!! I told you to call me......LOL

I'll help you with the roll off roof.

Talk to you soon my friend

PS I probably should have told you this before you mixed